Job duties Prepare an estimate table for the feasibility study step, design construction drawings based on the extracted volume.
- Quantity take-off, basic construction estimates, project construction estimates.
- Quantity take-off from design drawings for feasibility study step and construction drawing design step.
- Collect quotes for materials and equipment to serve the work of making construction estimates.
- Coordinate with related departments such as structure, electricity, technology... during work implementation.
- Participate in working with appraisal and verification units
- Other tasks when assigned.
- Deploy volume take-off from design drawings for technical infrastructure works (factories, pipelines) and other types of related works.
- Prepare an estimate of the total investment according to the investment capital ratio or similar reference project.
- Prepare detailed estimates for total investment, total project construction estimates, and adjusted estimates.
- Verify the design estimate for the feasibility study step and the construction drawing design step.
- Establish and control costs and unit prices in total investment, total construction estimate, and project adjustment estimate.
- Update prices of materials, labor, construction machines, and construction unit prices from time to time to serve estimating.